Grant number: 108666 | Funding period: 2023 - 2028
Active
H Dissanayake, T Gunawardena, P Mendis
2026-01-01
Improving alignment between timber sawmilling and prefabrication, defined as the coordination of information, materials, and decis..
2025-09-01
The integration of sawmilling with prefabrication manufacturing presents a critical opportunity to enhance the efficiency, sustain..
2025-04-01
Connection systems are a critical component of buildings constructed with engineered wood products (EWPs), influencing structural ..
IT Amarasinghe, Y Qian, T Gunawardena, P Mendis, B Belleville
2024-10-01
The global demand for sustainable building materials has fuelled research into composite panels from wood waste. Despite their pot..