Journal article

Scheduling of two-machine robotic rework cells: In-process, post-process and in-line inspection scenarios

M Foumani, K Smith-Miles, I Gunawan

Robotics and Autonomous Systems | ELSEVIER SCIENCE BV | Published : 2017

Abstract

This study focuses on the domain of a two-machine robotic cell scheduling problem under three inspection scenarios. We propose the first analytical method for minimizing the partial cycle time of cells with in-process and post-process inspection scenarios, and then we convert this cell into a multi-function robotic cell with in-line inspection scenario. For the first scenario, parts are inspected in one of the production machines using multiple sensors, while the inspection process is performed by an independent inspection machine for the second scenario. Alternatively, the inspection can be performed by a multi-function robot for the third scenario. A distinguishing characteristic of this r..

View full abstract

University of Melbourne Researchers