Journal article
A framework for stochastic scheduling of two-machine robotic rework cells with in-process inspection system
M Foumani, K Smith-Miles, I Gunawan, A Moeini
Computers and Industrial Engineering | PERGAMON-ELSEVIER SCIENCE LTD | Published : 2017
Abstract
This study is focused on the domain of a two-machine robotic cell scheduling problem for three various kinds of pickup scenarios: free, interval, and no-wait pickup scenarios. Particularly, we propose the first analytical method for minimizing the partial cycle time of such a cell with a PC-based automatic inspection system to make the problem more realistic. It is assumed that parts must be inspected in one of the production machines, and this may result in a rework process. The stochastic nature of the rework process prevents us from applying existing deterministic solution methods for the scheduling problem. This study aims to develop a framework for an in-line inspection of identical par..
View full abstract