Journal article
Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm
M Blom, AR Pearce, PJ Stuckey
Engineering Optimization | TAYLOR & FRANCIS LTD | Published : 2018
Abstract
This article presents a novel algorithm for solving a short-term open-pit production-scheduling problem in which several objectives, of varying priority, characterize the quality of each solution. A popular approach employs receding horizon control, dividing the horizon into N period-aggregates of increasing size (number of periods or span). An N-period mixed integer program (MIP) is solved for each period in the original horizon to incrementally construct a production schedule one period at a time. This article presents a new algorithm that, in contrast, decomposes the horizon into N period-aggregates of equal size. Given a schedule for these N periods, obtained by solving an N-period MIP, ..
View full abstractRelated Projects (2)
Grants
Awarded by Australian Research Council
Funding Acknowledgements
This work was funded by an Australian Research Council (ARC) Linkage grant [LP110100115] in conjunction with an industry partner.