Conference Proceedings
Generating Long-lead Forecasts and Stochastic Scenarios of Streamflow
QJ Wang, JC Bennett, Y Song, DE Robertson, M Li, A Schepen, JJ OSullivan (ed.), M Bruen (ed.)
GRAND CHALLENGES FACING HYDROLOGY IN THE 21ST CENTURY | UNIV COLLEGE DUBLIN | Published : 2014