Conference Proceedings

Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN

E Roslan, H Mohamed, L Chan, MR Isa

Aip Conference Proceedings | AMER INST PHYSICS | Published : 2018

Abstract

Assessing the wind resource available at a particular site is the initial step of determining the feasibility of a wind turbine installation project. Several methods are frequently used to assess wind resource at a particular site, such as using wind map, local site measurement and measure-correlate-predict. A certain degree of measurement at site is needed for the final two methods. Wind speed data is usually measured and collected at a certain frequency or sampling rate, based on the resolution of the measurement device used. This data is then averaged at a certain period, depending on the standards used or its application. This research investigates the effect of having different averagin..

View full abstract

University of Melbourne Researchers

Grants

Awarded by Universiti Tenaga Nasional


Funding Acknowledgements

The authors would like to thank Universiti Tenaga Nasional for funding this project under grant number J510050618. We would also like to thank Universiti Tenaga Nasional for funding its publication.