Journal article
Design, installation and preliminary testing of a permeable reactive barrier for diesel fuel remediation at Casey Station, Antarctica
KA Mumford, JL Rayner, I Snape, SC Stark, GW Stevens, DB Gore
Cold Regions Science and Technology | Published : 2013
Abstract
To minimize the environmental impact of a fuel spill a permeable bio-reactive barrier (PRB) was designed and installed at Australia's Casey Station. The PRB was designed to prevent further migration of a decade-old fuel spill during summer melt periods by intercepting catchment flow down-gradient of the spill. Catchment flow was intercepted using a PRB with a funnel and gate design. This is the first time a full-scale PRB has been designed and installed specifically for polar regions. This paper reports on the selection of a location for a PRB, and the subsequent design, installation and testing of the PRB throughout the first summer of operation at Casey Station, Antarctica.The PRB was desi..
View full abstractGrants
Awarded by Australian Research Council